IPLAN: Infrastructure gets supplied

DSC_-picsay

 The server rack being assembled with switchboards and servers in the server farm at JPBD HQ

DSC_-picsay1

 The Workstation supplied to BMGN

The IPLAN project which took off on 2/10/2013 and targeted to end 31/12/2013 has already begun delivery of hardware and software. A workstation was distributed to each state JPBD department and BMGN between late October and Mid November while 7 servers inclusive of the periphery equipment were assembled into the server rack on 15/11/2013. The Term of Reference only requires the consultant to install and configure the operating system and applications next year so that they can concentrate their time on the preparation of the Logical Data Model (LDM), Information Architecture (IA) and Metadata which needs to be completed by the end of the year. Softwares were downloaded as .ISO files then burn and supplied in CDs to BMGN.